Projects

Case Study 15 – Wigan Pool Repair

Lovett Pools had to go to Wigan to measure up a new liner for our client. After taking the measurements and ordering in the mad up liner, 10 days later this is the outcome. We had to drain water, remove the old liner, pressure test the pipework and then fit new pool liner. As you

Case Study 14 – Derby Leaking Pool

This job was in Derby and all the pool pipes were leaking. Lovett Pools had to break all of the pipework out, remove them and then replace with all new pipework and all new fittings. The customer also wanted new built in steps into pool, which we installed.

Case Study 13 – Cranley Pool Repair

This job in Cranley was leaking it turned out after a pressure test of all pipes that the skimmer was leaking. So Lovett Pools had to drain the pool down, break the old skimmer out and replace with new skimmer.

Case Study 12 – New Lining and Pipework

This job was in the middle of Surrey Cobham the liner was all ripped and torn and the pipework was leaking. When I was there the customer asked me to build some internal steps in his pool before fitting new liner. Plus all the floor was broken. I had to take outliner patch up the

Case Study 11 – Leicester Town Centre

This job was in the centre of Leicester town centre. We turned the normal marble light swimming pool into liner pool as the marble lights was leaking from the Shell. We had to dig down change all the fittings and put line a lot around the top of the shell so this Pool can take

Case Study 8 – Pool Wash

Lovett Pool Was called out to this job in quorn Leicester today as a pool and the pool surround has lots of Calcium on it. So I cleaned the cover drain down the pool and acid washed the tiles around the swimming pool what a difference it all looks now

Case Study 7 – Liner Leakage

I was called out to this job in Gloucester today to have a look at the liner as the pool is leaking. I discovered that I needed a New pool Liners as the liner has had it . So I measured for new Pool liner 10 day later come back and fitted the new liner

Case Study 6 – Leakage Fix

I was called out to this pool in Leicestershire As the palled was losing water I had to pressure test all pipework and found out the skimmer was leaking. So I draindown the water past the skimmer had to cut out 8 inches of concrete to get the old skimmer out replaced it with new